How to Size a Diesel Generator: A Practical kVA Guide for Buyers

Avoid the two most expensive mistakes in genset procurement — undersizing and oversizing. A step-by-step method to choose the right kVA, with a worked example.

Reviewed by Jim Yue, Head of Supply Chain

To size a diesel generator, add up the loads that run at the same time and add the starting surge of the largest motor. Divide by the power factor (≈0.8) to get kVA, derate for altitude and heat, then add 10–20% reserve. The rest of this guide goes through each step with figures and common mistakes.

A correctly sized generator runs reliably. A wrongly sized one overheats, suffers wet-stacking, or cannot start your motors. The two most expensive purchasing mistakes are undersizing and oversizing. An undersized set trips under load. An oversized set costs more at purchase, then runs at light loads the engine was not designed for.

Step 1: List every load and its running power

Write down each appliance or machine the generator must run, with its running (continuous) power in watts or kW. Take the figure from the nameplate, not from memory. For a mixed site, add up the loads that will run at the same time, not everything you own. A workshop rarely runs the welder, the compressor and every light together.

Step 2: Allow for the starting surge

Electric motors (pumps, compressors, air-conditioning units) draw 3–7× their running current at startup. This inrush current, not the running load, usually decides the generator size. As a rule of thumb, add the starting requirement of the largest motor to the running total of everything already on. A 5 kW pump may need 15–20 kW available at the moment it starts.

If several motors can start at once, start them one after another. A staggered start sequence reduces the capacity you need at no cost. If your site cannot stagger starts, as with automatic pump arrays, size for the worst simultaneous start.

Step 3: Convert kW to kVA

Generators are rated in kVA, but loads are often given in kW. Convert with the power factor (PF):

kVA = kW ÷ PF (typical PF for mixed commercial loads ≈ 0.8)

So a 16 kW load at 0.8 PF needs 20 kVA.

Step 4: Add headroom for altitude and temperature

Diesel engines lose output in thin air and high heat, which matters at highland and tropical sites. Typical derating is roughly:

Sites at 3,000–4,000 m can lose 15–20% of rated output. Size for the derated figure, then add 10–20% reserve for future loads. The full explanation, including what turbocharging does and does not fix, is in our guide to why diesel engines lose power at altitude.

Step 5: Choose phase, frequency and rating type

Worked example

A small farm workshop has lighting and tools of 6 kW running, a 4 kW water pump that starts under load, and a 3 kW cold-room compressor.

  1. Running total with everything on: 6 + 4 + 3 = 13 kW
  2. Largest motor start: the pump may demand ~3× → add ~8 kW of surge headroom → 21 kW peak
  3. Convert: 21 ÷ 0.8 = 26 kVA
  4. Site at 2,500 m: derate ~15% → the derated output must cover 26 kVA → look at ~31 kVA rated
  5. Add reserve → a 33–35 kVA prime-rated, three-phase set is the right range.

If you skip step 4, a generator that looked correctly sized at sea level will trip regularly at a highland site.

Open-frame, silent or welding

TypeBest for
Open-frameConstruction sites, lowest cost, easy access
Silent (enclosed)Occupied areas, < 75 dB, weather-resistant
Welding generator setField repair and fabrication: power and welding in one machine

The most common mistakes

Quick reference

  1. Total running load → 2. Add largest motor’s starting surge → 3. ÷ 0.8 to get kVA → 4. Derate for altitude/heat → 5. Add 10–20% reserve.

The generator size calculator runs the same five steps with your figures and shows which of our models cover the result.


Not sure which model fits your duty cycle? Browse the diesel generator range, then send us your application, power requirement, altitude and the loads you need to start. Our engineers will recommend the right HTX set and confirm the lead time within 24 business hours.

Need help sizing your unit?

Send us your loads, altitude and duty cycle. We will specify the right model.

Need a quote? Reply in 24 business hours